1997

Company holiday resort

Zamárdi

The building   was realized near the beach of the Lake Balaton on a large corner site with valuable, old stand where beside the expectations of the principal the designer had greater freedom. Here this is not the ordering of the geometric cubes to each other, the integration of them that form the building mass but the interior and the interim space like a joint line of spaces, it is projected to the exterior space forming the space for relaxation where the use of natural materials is similarly predominant.

Hasonló munkák

Budakeszi
2005

The history of the building dates back to the 1960’s when the building was set up in the modernist style characteristic to that era. It was Laszlo Barcsay architect and Laszlo Prohaszka interior designer who planned the hunting lodge with careful meticulosity. In the 1980’s the building have gone through various building and renovation works […]

Pécs
2004

After its reconstruction, the main entrance of the building has been moved to the northern leading bridge. From there we get to the new, large courtrooms. On the ground floor there is a registrar, a garage and mechanical engineering rooms. With the establishment of ramps free movement has been ensured. The building mass consists of […]

Sarród, Rév-Kócsagvár
1992

The directorship of the National Park chose the parkland clearing of Sarród village at the encounter of Fertő – Hanság at the border of the nature zone as the spot of its hall. Beside the protection of the flora and fauna, the National Park’s conservationist task is the preservation and the conveyance of the historico-cultural […]

Szigetvár
2011

The secondary school is situated in the heart of Szigetvar’s ancient city centre. The construction of the extant building started in the beginning of the 1900’s. The one-storey, U-shaped edifice was built in the art nouveau style. Later, there were more enlargements. The current plan is to join the separate units of the building and […]