1997

Company holiday resort

Zamárdi

The building   was realized near the beach of the Lake Balaton on a large corner site with valuable, old stand where beside the expectations of the principal the designer had greater freedom. Here this is not the ordering of the geometric cubes to each other, the integration of them that form the building mass but the interior and the interim space like a joint line of spaces, it is projected to the exterior space forming the space for relaxation where the use of natural materials is similarly predominant.

Hasonló munkák

Szigetvár
2011

The secondary school is situated in the heart of Szigetvar’s ancient city centre. The construction of the extant building started in the beginning of the 1900’s. The one-storey, U-shaped edifice was built in the art nouveau style. Later, there were more enlargements. The current plan is to join the separate units of the building and […]

Sarród, Rév-Kócsagvár
1992

The directorship of the National Park chose the parkland clearing of Sarród village at the encounter of Fertő – Hanság at the border of the nature zone as the spot of its hall. Beside the protection of the flora and fauna, the National Park’s conservationist task is the preservation and the conveyance of the historico-cultural […]

Pécs
2004

The Alexandra publisher, Hungary’s decisive publishing company built its central plant in the industrial area of Pécs city, but on a sloping site with panoramic view. Our task was to create a 15000 m2, multi-storey book distributing depository base suitable for accepting regular truck traffic complemented with a 16-meter-high automatic high depot. Beside the logistic […]

Keszthely
1994

For the planning of the new building unit of the János Nagyváthy Agricultural and Medical Specialized Secondary School a tender was called in the year of 1994. The 1st-award winner plan (the work of József Koller and András Köves) had not been realized yet at that time. The process of planning started with a challenge […]