1997

Company holiday resort

Zamárdi

The building   was realized near the beach of the Lake Balaton on a large corner site with valuable, old stand where beside the expectations of the principal the designer had greater freedom. Here this is not the ordering of the geometric cubes to each other, the integration of them that form the building mass but the interior and the interim space like a joint line of spaces, it is projected to the exterior space forming the space for relaxation where the use of natural materials is similarly predominant.

Hasonló munkák

Szigetvár
2011

The secondary school is situated in the heart of Szigetvar’s ancient city centre. The construction of the extant building started in the beginning of the 1900’s. The one-storey, U-shaped edifice was built in the art nouveau style. Later, there were more enlargements. The current plan is to join the separate units of the building and […]

Pécs-Kővágószőlős
2009

The task of our office was to design an incubator house for the companies settled in the new industrial park that had been realized within the framework of the brown-meadow investment by converting the building of the former plant. The major aim of the incubation was to accommodate the novice companies and generate their development […]

Pécs
2004

After its reconstruction, the main entrance of the building has been moved to the northern leading bridge. From there we get to the new, large courtrooms. On the ground floor there is a registrar, a garage and mechanical engineering rooms. With the establishment of ramps free movement has been ensured. The building mass consists of […]

Debrecen
2005

The task was the placement and the planning of the High Court of Justice, the Supreme Prosecutor’s Office and the Town Court in the heart of Debrecen, the civic city with 1000-year history. The planning was preceded by a national tender which fit the build-in of the entire Révész-square block to its new program. From […]