2011

Miklos Zrinyi Secondary School in Szigetvar

Szigetvár

The secondary school is situated in the heart of Szigetvar’s ancient city centre. The construction of the extant building started in the beginning of the 1900’s. The one-storey, U-shaped edifice was built in the art nouveau style. Later, there were more enlargements. The current plan is to join the separate units of the building and enlarge it with a buzzing assembling hall and a new entrance. The assembly hall is to be able to give place to environmental, cultural, technological and scientific lectures coupled with occasional exhibitions and community building programs. During the enlargement our main object was to fit to the contemporary requirements but preserve this historic monument in its original condition with its secessionist values.

Hasonló munkák

Keszthely
1994

For the planning of the new building unit of the János Nagyváthy Agricultural and Medical Specialized Secondary School a tender was called in the year of 1994. The 1st-award winner plan (the work of József Koller and András Köves) had not been realized yet at that time. The process of planning started with a challenge […]

Zamárdi
1997

The building   was realized near the beach of the Lake Balaton on a large corner site with valuable, old stand where beside the expectations of the principal the designer had greater freedom. Here this is not the ordering of the geometric cubes to each other, the integration of them that form the building mass […]

Pécs-Kővágószőlős
2009

The task of our office was to design an incubator house for the companies settled in the new industrial park that had been realized within the framework of the brown-meadow investment by converting the building of the former plant. The major aim of the incubation was to accommodate the novice companies and generate their development […]

Pécs
2004

After its reconstruction, the main entrance of the building has been moved to the northern leading bridge. From there we get to the new, large courtrooms. On the ground floor there is a registrar, a garage and mechanical engineering rooms. With the establishment of ramps free movement has been ensured. The building mass consists of […]